Focus on solving DC power solutions

Create high-standard and reliable power products

Support Hotline:

+86-13902319159

+86-755-84868780

XingZhongKe Power Technology Co., Ltd.微信二维码
Location:HOME >> Solution

Solution

How to inspect and maintain solutions for power transformers (isolating transformers)

XingZhongKe Power Technology Co., Ltd.Release Time:2019-10-08

  

1. The content of regular test of power transformer includes:


①. Oil sample testing-performance indicators such as withstand voltage and impurities are carried out once every three years, and the cycle can be shortened for long-term full load or overload operation of the transformer.


② The high and low voltage insulation resistance is not less than 70% (10MΩ) of the original factory value, and the DC resistance of the winding at the same temperature, the difference between the three-phase average value should not be greater than 2%, and it is not compared with the result of the previous measurement. Should be greater than 2%.


③ The grounding resistance of the transformer is measured once every two years.


④ The cycle of cleaning and inspection after power failure is determined according to the surrounding environment and load conditions, generally once every six months to a year;


The main contents include the removal of defects found during inspections, cleaning of the porcelain casing, replacement of cracked or aging rubber pads, inspection and tightening of connection points, oil shortage and replenishment, inspection and replacement of respirator silica gel, etc.


2. The daily maintenance methods are:


① Grounding of power transformer


② The housing of the transformer should be grounded reliably, the working neutral wire and the neutral grounding wire should be laid separately, and the working neutral wire should not be buried in the ground.


③ The neutral ground loop of the transformer should be made of detachable connecting bolts near the transformer. Bus processing machine


④ The grounding of transformers equipped with valve arresters should meet the requirements of the trinity; that is, the neutral point of the transformer, the transformer shell, and the grounding of the arrester should be connected at one place and grounded together.


⑤ The grounding resistance should be less than 4 ohms.


Create an industry "power brand", a "first-class enterprise" in China and a "century old enterprise" in the world.

Leading technology innovation service, Consulting Hotline:+86-755-84868780

Xingzhongke6Big advantage

XingZhongKe Power Technology Co., Ltd.

    Independent research and development

    Xingzhongke has many years of experience in the supply of brands in the power supply industry and is a high-tech enterprise specializing in the production of power products.

XingZhongKe Power Technology Co., Ltd.

    Whole process production control

    The industry implements full-process production control, from raw materials to production to packaging and shipment, and has established a complete quality supervision and inspection system.

XingZhongKe Power Technology Co., Ltd.

    Fast delivery capability

    Xingzhongke Power has a professional distribution team that actively responds to customer feedback and needs to ensure that customers receive the products they need at the specified time.

XingZhongKe Power Technology Co., Ltd.

    Years of industry experience

    It has advanced testing equipment and automated production equipment at home and abroad, and a professional design, development, management and operation team.

XingZhongKe Power Technology Co., Ltd.

    Reasonable price and good product

    With the concept of mid-end price for high-end products as the core, we insist on cost control from raw materials to the production process.

XingZhongKe Power Technology Co., Ltd.

    Full tracking service

    Strive to achieve beyond what customers think, from customer order to product delivery. Provide your company with technical support and provide customers with high-quality butler-style services!